Belltown to Seattle Center Connection Project
This content has been professionally translated in other languages.
Este contenido ha sido traducido profesionalmente a otros idiomas.
ይህ ይዘት በሙያዊ በሌሎች ቋንቋዎች ተተርጉሟል።
Belltown Seattle Center Connection Project Overview
The Belltown to Seattle Center Connection Project (4th Ave Protected Bike Lane Extension) is part of the North Downtown Mobility Action Program. The purpose of this project is to extend the 4th Ave protected bike lanes (PBLs) and close a gap in the regional bike network. This project will build a new two-way PBL from Vine St to 5th Ave N and Thomas St via Broad Street. The new bike lanes align with our ongoing efforts to improve how we move through our streets and public spaces, as outlined in the North Downtown Mobility Action Plan.
If you want to learn more, call us at (206) 684-ROAD. If you need information about the project in another language, tell us your preferred language in English when you call. We offer translation and interpretation for free.
Resumen del Proyecto de Conexión de Belltown al Seattle Center
El Proyecto de Conexión de Belltown al Seattle Center (extensión del carril para bicicletas protegido en la 4th Ave) forma parte del Programa de Acción para la Movilidad del Norte del Centro de la Ciudad. El propósito de este proyecto es extender los carriles para bicicletas protegidos (PBLs, por sus siglas en inglés) en la 4th Ave y cerrar una brecha en la red regional de ciclovías. Este proyecto construirá un nuevo carril protegido bidireccional para bicicletas, desde Vine St hasta 5th Ave N y Thomas St a través de Broad Street. Los nuevos carriles para bicicletas se alinean con nuestros esfuerzos continuos para mejorar la manera en que nos desplazamos por nuestras calles y espacios públicos, tal como se describe en el Plan de Acción de Movilidad del Norte del Centro de la Ciudad.
Si desea obtener más información, llámenos al (206) 684-ROAD. Si necesita información sobre el proyecto en otro idioma, díganos su idioma preferido en inglés cuando llame. Ofrecemos servicios de traducción e interpretación gratis.
የቤልታውን ሲያትል ሴንተር ግንኙነት ፕሮጀክት አጠቃላይ እይታ
የቤልታውን ሲያትል ሴንተር ግንኙነት ፕሮጀክት (የ4th Ave የተጠበቀ የብስክሌት መስመር ማራዘሚያ) የሰሜን ዳውንታውን ተንቀሳቃሽነት እርምጃ ፕሮግራም አካል ነው። የዚህ ፕሮጀክት ዓላማ 4th Ave ላይ የተጠበቁ የብስክሌት መስመሮችን (PBLs) ማራዘም እና በክልል የብስክሌት አውታር ላይ ያለውን ክፍተት መዝጋት ነው። ይህ ፕሮጀክት ከVine St እስከ 5th Ave N እና Thomas St በBroad Street በኩል አዲስ ባለሁለት አቅጣጫ መንገድ PBL ይገነባል። አዲሶቹ የብስክሌት መስመሮች በሰሜን ዳውንታውን ተንቀሳቃሽነት እርምጃ ፕሮግራም ውስጥ በተገለጸው መሠረት በጎዳናዎቻችን እና በህዝባዊ ቦታዎች እንዴት እንደምንንቀሳቀስ ለማሻሻል ከምናደርገው ጥረት ጋር ይጣጣማሉ።
የበለጠ ለማወቅ ከፈለጉ በ(206) 684- ROAD ይደውሉልን። በሌላ ቋንቋ ስለ ፕሮጀክቱ መረጃ ከፈለጉ፣ ሲደውሉ የመረጡትን ቋንቋ በእንግሊዝኛ ይንገሩን። የቃል ትርጉም እና የጽሑፍ ትርጉም በነጻ እናቀርባለን።
Updated January, 2026
What's Happening Now?
We have reached the final phase of the Belltown to Seattle Center Connection project. Changes to the project design include:
- One-way protected bike lanes instead of two-way bike lanes on Broad St to create a more direct connection to the Thomas St Greenway.
We added loading zones to several locations in the project area:
- North side of Cedar St at 4th Ave, next to bike/scooter corral
- Relocate the charter bus load zone on Broad St to west of the Seattle Center Loop to reduce conflicts between people walking, biking, and rolling.
- The general vehicle load zone will expand and remain east of the Seattle Center Loop.
- South side of Broad St between John St and 5th Ave N
Expanded bike/scooter corrals in project area to reduce conflicts with people walking, biking, and rolling:
- 4th Ave and Vine St
- 4th Ave N and Denny Way
- 4th Ave N and Broad St
- Broad St between Denny Way and 5th Ave N (various locations)
View the cross sections and final design below for more information.
The project extends transportation improvements to provide a safer, more comfortable way to bike and roll between some of Seattle's most popular destinations. These near-term improvements between Belltown and Seattle Center will enhance safety and accessibility in preparation for the 2026 FIFA Men's World Cup. We anticipate construction to be completed before June 2026.
If you have any questions or would like to receive project updates, please email our project inbox at belltownseattlecenterconnection@seattle.gov.
Project Area
The protected bike lanes will separate modes of transportation, providing protection for people riding bikes, and improve access to businesses. It will allow people of all ages and abilities (AAA) to safely bike between downtown Seattle and Seattle Center.
Project Design
The new two-way protected bike lanes on 4th Ave, 4th Ave N, and directional protected bike lanes on Broad St will separate people biking from moving vehicles with hardened barriers.
Project Elements
All Way Crossing
- Broad St and John St: A new All Way Crossing allows people walking and rolling to cross in all directions with no vehicle traffic. Vehicle turning movements will improve without conflicts with non-motorized users. The All Way Crossing will make it easier for everyone to get to Seattle Center.
Connecting to Thomas St Greenway
- Broad St, 5th Ave N, and Thomas St: There is an All Walk crossing phase at this offset intersection which stops all vehicular traffic. People biking can also use this pedestrian phase to move through the intersection in the street. Like other downtown intersections, the pedestrian phase is automatic at this location. Bike navigation will include signage and pavement markings.
Parking and Loading Zones
- 4th Ave: The parking and loading lane is generally shifted outside of the bike lane (similar to the existing 4th Ave bike lanes). The project will maintain as much parking and loading as possible but needs to remove some to improve visibility at intersections and driveways.
- 4th Ave N: We will remove parking from the west side of the street and change parking from diagonal to parallel on the east side of the street. We will maintain 30-minute parking near the corner of Denny Way to support businesses in the area.
- Broad St: The charter bus load zone will be relocated to west of the Seattle Center Loop to reduce conflicts between people walking, biking, and rolling. The general vehicle load zone will expand and remain east of the Seattle Center Loop.
Signal Upgrades
- Bike Signals: We will install new bike signals at 4th Ave and Vine St and 4th Ave and Denny Way. At Denny Way, we are proposing to restrict right turns from 4th Ave onto eastbound Denny Way.
- Diagonal Crossing: New bike signals at the diagonal crossing at 4th Ave and Cedar St will safely guide people biking through the intersection. People biking northbound and southbound will have their own protected signal phase.
Design Cross Sections
4th Ave from Vine St to Cedar St -- Looking North

4th Ave from Cedar St to Denny Way -- Looking North

Broad St from Denny Way to 4th Ave N -- Looking East

4th Ave N from Denny Way to Broad St -- Looking North

Broad St from John St to 5th Ave N -- Looking East

2026 FIFA Men's World Cup
Seattle will host six matches at Lumen Field during the 2026 FIFA Men's World Cup. The World Cup organizing committee has chosen Seattle Center for the World Soccer Celebration, the biggest community event location outside the matches in the stadium. An estimated 750,000 World Cup fans will visit Seattle and Seattle Center's World Soccer Celebration is expected to attract tens of thousands of people. This project will provide an AAA connection between Lumen Field and the World Soccer Celebration at Seattle Center while passing by the many hotels in between.

This map represents bike routes between Seattle Center, Lumen Field, and
hotels in the downtown area. Click here to view the entire bike network.
2026 World Cup Stage Matches in Seattle:
- Monday, June 15
- Friday, June 19
- Wednesday, June 24
- Friday, June 26
2026 World Cup Knockout Matches in Seattle:
- Round of 32: Wednesday, July 1
- Round of 16: Monday, July 6
Additional Information
This project will:
- advance the 2013 Climate Action Plan goal to reduce greenhouse gas emissions
- provide a direct, AAA connection between World Cup matches at Lumen Field, downtown hotels, and World Soccer Celebration at Seattle Center
- aim to have 80% of FIFA match attendees arrive without a personal vehicle
- increase the use of shared micromobility leading up to and during the 2026 FIFA Men’s World Cup
Timeline
We are currently in the final design phase of the near-term improvements. We anticipate construction to be completed prior to the 2026 FIFA Men's World Cup.

Funding
This project is funded entirely by the North Downtown Mobility Action Plan (NODO MAP), also known as the City Arena Transportation Fund.